Contemporary Trails For Any Adventure

Industry

Environmental Trail Services is a South Australian business, committed to providing leading trail design and construction solutions. Our team is dedicated to building sustainable trail networks, using modern and traditional methods of construction to provide trails that best suit our clients’ needs and requirements. These trails aim to take advantage of existing, beautiful landscapes and turn them into the best possible trails with modern technology.

Services We Provide

Design & Construct

-Consultancy
-Trail audits and reporting
-Fully ground truthed trail designs with GPS mapping
-Design of trail networks
-Construction methodology recommendations
-Design and engineering of structures such as boardwalks, bridges and stairs
-Cost estimates
-Weed control and environmental recommendations
-Landscape design

Consultancy

-All styles of trail: MTB, shared use and equestrian, pump tracks, BMX
in house team and equipment for construction.
-Work closely with land managers to deliver the project they want
-Follow IMBA guidlines
-Innovative modern trail building techniques
-Trail maintenance
-Specialised trail building equipment
-Fully licensed to undertake construction of most structural elements
-Landscape elements such as shelters, seating, bbq, nature play areas

Project Management

-Trained in project management with commercial experience
-Proven history of delivering projects on time and on budget
-Internal quality control and staff training to latest techniques
-Strict adherence to WHS policies.
-Environmental & Trail Services Pty Ltd has a variety of internal procedures in place to ensure that all of our work meets the industry standards for quality and safety and environmental management.

The Finished Product

Bike

Bike

ETS has a strong history in project management with many years of experience in delivering commercial and civil projects, we have recently enlisted a junior project manager to assist with planning, procurement and contracts administration. This benefits us by having all of our skilled staff available to be on the ground, performing the work.

Hike

Hike

Environmental Trail Services is a South Australian owned and operated business, committed to providing leading trail design and construction solutions. Our team is dedicated to building sustainable trail networks, using modern and traditional methods of construction to provide trails that best suit our clients’ needs and requirements while keeping safety at the forefront of our work.

Maintain

Maintain

We specialise in trail design and construction, ongoing maintenance programs, trail rehabilitation, auditing and feasibility studies. Here at ETS trails we are passionate about the environment and as a result our aim is to maintain the local flora and fauna, whilst enhancing the environment and providing high quality trails.

Contact us to enquire about our services today.

Case Studies

Antsey Hill RP (Coming Soon)

This project will be unveiled soon. Get in touch with us and stay updated with the recent updates.

Heysen Trail, Deep Creek CP

A 3km natural surface trail to replace existing fall line trail that was heavily eroded.
The new trail is a classic contour trail, allowing a pleasurable, yet challenging hike, whilst taking many of the magnificent views of the coast and the diverse flora and fauna that the area has to offer.

The trail was challenging but rewarding to construct as it traversed through dense vegetation and through some steep terrain which required many stone walls and armouring.

DH1 and DH2, Shepherds Hill RP

Environmental and Trail Services Pty. Ltd. were invited to prepare a proposal to design and construct 2 new mountain bike specific trail in Shepherds Hill RP. The new alignments were designed to maximise the trail experience in a small amount of space and a limited amount of time. The trail alignments were designed to take in natural feature of the area such as rock reefs and scree slopes. A large components of the project was the removal of olives from the trail corridor which were either removed or poisoned using the frill and fill technique.

Mambray Creek, Class 2 Walking Trail, Mt. Remarkable NP 2012

Some unique challenges applicable to this project involved sourcing a suitable material to be used for capping the trail due to the remote location of the project.

This project also required our team to stay away from home for 6 weeks proving our ability to manage general logistics involved with working in remote areas including, food and drinking water, fuel for plant and equipment, tools for onsite repairs of equipment. This project was delivered within the specified time frame and was consistent with the program of works submitted.

Installation of seating and viewing areas constructed from site won stone. Converted redundant camping sites into meeting zones for trail users. Installation of trail heads and trail markers.

Find out why we are the market leaders

Join The Conversation On Facebook & Instagram

Unable to display Facebook posts.
Show error

Error: Error validating application. Application has been deleted.
Type: OAuthException
Code: 190
Please refer to our Error Message Reference.
This error message is only visible to WordPress admins

Error: No feed found.

Please go to the Instagram Feed settings page to create a feed.